Air Make Up Unit Overview

Presented by Luke Downing

Learn how air makeup units keep spray booths safe, balanced and energy-efficient. This webinar covers CT series AMU features, configuration options, heat and cure modes, recirculation, and temperature and humidity control, plus what’s needed to quote your project. Topics include: • Why NFPA requires air makeup units • Automatic booth pressure control with VFDs and a PLC • Heat-only, cure, prep and demand modes • Low-profile units, power, gas supply and lead times • Recirculation during cure vs. during spray • Temperature and humidity control requirements • Information needed for a quote

Video Chapters

 

Air Makeup Units: Overview and Applications

Chapter 1: Introduction

I’m Luke Downing, Regional Sales Manager for the Southeast. Today we’re covering an overview of air makeup units and their applications.

Our corporate headquarters is a 150,000 sq. ft. facility in Rockwall, Texas, where we manufacture our products in-house. We have an open-door policy, so feel free to call or visit anytime.

Chapter 2: Three Main Business Segments

We have three main business segments:

  • Core and catalog equipment: spray booths, automotive booths, powder booths and ovens.
  • Engineered products: complete finishing systems, including washers, cure ovens and custom lines.
  • Filtration products: we’re the only manufacturer that builds spray booths and also produces its own filter line.

This is a brief overview of air makeup units (AMUs). We’ll cover our CT series unit and custom units, including recirculation and temperature and humidity control. We’ll also cover jobsite constraints and configuration options, so you can advise your customers well and request a quote from us.

Chapter 3: Air Makeup Units (AMUs)

An AMU is an NFPA requirement. It replaces the air the spray booth exhausts.

Without one, the booth creates negative pressure in the building. Doors can slam shut or become hard to open, which is a safety issue for personnel. The booth also pulls heated air out in winter and conditioned air out in summer, which creates hidden energy costs for the customer.

Our CT series units are sized to the application. The AMU replaces the same CFM the booth exhausts, so a 10,000 CFM booth gets a 10,000 CFM unit.

Configurations include horizontal, vertical and multiple discharges. We offer two types:

  • Dedicated units: ducted directly to the booth.
  • Demand units: general building air replacement.

We’ll also cover recirculation and temperature and humidity control.

CT Series highlights

  • ETL listed, with a galvanized finish.
  • Automatic booth pressure control. VFDs on the AMU intake fan and the booth exhaust fan, plus a PLC controller, make it easy to balance the booth and keep it at positive pressure.
  • Lower noise, thanks to larger ductwork. Ductwork size can complicate installation, especially when an indoor unit sits on top of the booth and must still draw fresh air from outside.
  • Extensive configuration options, including outdoor, vertical and rooftop units, for when running ductwork outside is difficult or expensive.
  • Third-party listings are available.
  • Five-year warranty. When you use our filters in our spray booth, the AMU, the booth and the LED lights are all covered. That’s every major component.

Chapter 4: CT Series AMU – Orientation and Configuration Options

There are many configurations, and each has its own benefits. Depending on the building and booth location, you can find an orientation that fits. If you have a configuration in mind, suggest it to us.

Controls

The standard panel includes a digital Magnehelic gauge. Operators can start and stop the booth and AMU, run cure mode (not included on heat-only units), and turn the booth lights on and off. The panel shown here was customized with adjustable light levels, so the operator could run different foot-candle settings.

The controller works much like a home thermostat. It stores multiple cure recipes, or winter and summer modes on heat-only units. It also shows fan and burner status and is very user-friendly.

Chapter 5: AMU Models – Heat, Cure

  • Heat only: up to a 90°F temperature rise, adjustable down if the customer needs less heat.
  • Cure mode: cuts exhaust by half and raises the temperature. This cures some coatings and dries parts faster. If a customer dries parts in half the time, they can roughly double throughput.
  • Dedicated unit: ducted directly to one booth and supplies air only to that booth.
  • Prep mode: gun hooks inside the booth signal the AMU when the operator hangs up the spray gun. The system then reduces exhaust and supply CFM, which lowers operating and energy costs.
  • Demand unit: a building air replacement unit. It can run at multiple speeds and serve multiple booths.

Chapter 6: AMU Considerations

  • Low-profile units: when structure above the booth leaves no room for a standard AMU, a low-profile unit uses two fans instead of one. The ductwork gets larger, but height can drop to as low as 3–4 ft., depending on CFM.
  • Installation: rooftop placement has benefits but requires additional installation equipment. We provide drawings and dimensions so you know exactly what’s needed ahead of time.
  • Service access: a service platform and ladder can be added to the booth for easier AMU maintenance.
  • VFD distance: keep the AMU control panel VFD within 100 ft. of the booth exhaust panel VFDs. Beyond 100 ft., special-gauge wiring is required, and costs rise quickly.
  • Single-phase power: we can accommodate it, but large motors draw high amperage. Some customers can’t support the load. Recommend three-phase, which also saves money long term.
  • Gas supply: the unit requires a regulated 2 PSI gas inlet. Some East Coast sites run lower. We can accommodate that, but we need to know before production.
  • Manufacturing: built in Wisconsin by Titan. The CT unit is engineered exclusively for RTT. Expect higher freight to southern locations.
  • Lead times: AMUs typically take 8–10 weeks. Booths usually ship sooner. We can ship both together, or ship the booth first so installation can start.
  • Finish: galvanized is standard. Painted white is available at additional cost, which is worth it cosmetically when the booth is powder-coated white.
  • Capacity: 1,200–120,000 CFM. At the high end, we’ll usually recommend multiple units rather than one very large unit.

What we need for a quote

These questions come straight from the request-for-quote form at rttsolutions.com. Select “yes” for an air makeup unit and the additional questions appear:

  • AMU type (heat only, heat/cure)
  • Orientation
  • Location
  • CFM required
  • Airflow balancing: automatic is standard. Manual can suit a demand unit used only for building air replacement.
  • Multi-unit input: for buildings with multiple booths, so the AMU can supply the right CFM depending on which booths are running.

Chapter 7: AMU Models – Recirculation

There are two types: recirculation during cure and recirculation during spray.

Recirculation during cure

A mix box with dampers on each side is added to the AMU to control the air entering the unit.

Example: a booth requires 10,000 CFM. The AMU supplies 100% to the booth, and the exhaust fan is set to 20%, removing 2,000 CFM. Recirculation ductwork runs from the exhaust plenum to the mix box, returning 80% (8,000 CFM). The fresh-air damper brings in the remaining 20% (2,000 CFM).

This saves energy and heats the booth faster, because only 20% of the air comes from outside.

Recirculation during spray

This option has additional requirements. Standard ratios are 80/20 and 60/40. We recommend 80/20 for smaller booths and 60/40 for larger booths, to keep supply CFM in a similar range.

Example (70/30): the booth requires 10,000 CFM. The AMU supplies 30% fresh air. Air passes through the exhaust chamber, where we recommend high-efficiency filtration because VOCs are returned to the booth. A dedicated recirculation fan returns 70%. The exhaust fan removes 30% (3,000 CFM).

Additional requirements:

  • An LEL monitoring sensor and control panel keep recirculated air below 25% LEL, per NFPA.
  • Operators need PPE, including a fresh-air supply, because VOCs are present in the booth.

Chapter 8: Temperature & Humidity Control – Considerations

Temperature and humidity control is needed when a booth must hold a specific environment year-round, such as 75°F in both summer and winter.

  • Recirculation during spray is highly recommended. These units are expensive. An 80/20 setup means conditioning only 20% fresh air, which greatly reduces equipment cost. The LEL sensor and operator PPE add some cost, but operating savings make it worthwhile.
  • Insulated panels are recommended when the booth sits in a non-air-conditioned space, for example 75°F inside the booth and 100°F outside it. Insulation prevents condensation and improves environmental control.
  • Location: condensing units are large, pull in a lot of air and generate heat, so they belong outdoors. Keep the condenser and AMU close together. Elevation changes and turns in the refrigerant lines require re-engineering to determine proper pressure and glycol levels.

Chapter 9: Temperature & Humidity Control – Quotation

For a quote, we need:

  • Installation location, so we can pull ASHRAE climate data.
  • Unit orientation.
  • Temperature and humidity specs, for example 75°F ±5°F and 50% RH ±10%, year-round. Tighter ranges cost less. Wider ranges make the unit more expensive.
  • Chilled water availability. If it’s available, we need the entering and leaving water temperatures, plus glycol type and percentage. Using existing chilled water saves on capital equipment.
  • DX cooling if chilled water isn’t available. It’s the most common cooling method and usually less expensive than adding a chiller.

Q&A

What is a typical decibel level? It depends on unit size and installation location. For a standard unit in a typical installation, expect about 80–90 dB.

A customer has three booths and no AMU. Will a demand unit work, and how do the booths tie into it? Yes. A five-speed contact setup adds a contactor to each booth’s control panel. Each booth signals its CFM to the AMU, and the AMU adjusts to the booths that are running. Note that turndown is limited to 30% of full CFM.

What are the key considerations for sizing an AMU’s heating and cooling? CFM, plus the required temperature and humidity ranges. Recirculation has the biggest impact. Supplying only 20% fresh air greatly reduces unit size.

What velocity should the supply ductwork be designed for? Approximately 2,200 FPM.

Closing

This recording will be posted on the RTT Finishing Solutions YouTube channel, along with our past webinars. They’re a useful training resource for new team members.

You can also request a quote at colmetsb.com. The form’s questions go directly to our inside sales team.

A new four-part webinar series is now open to both end users and distributor personnel. It covers operating and maintaining equipment properly and reducing costs in current processes. If you didn’t receive the registration email, contact marketing@rttsolutions.com.

Thank you for attending.


Additional Resources

Not Sure Which System You Need?

Get a system built around your application, with the right airflow, filtration, and fit for your facility.

Request A Quote

With over 75 years of combined experience engineering complex, multi-component finishing solutions, our team has the expertise to design and build equipment for projects of any scale — tailored precisely to your specifications.

 

Share a few details below and we’ll have a proposal back to you within 24 hours.