Proper Use and Measurement of a Manometer

Presented by Cayce Carr and Trey Peavy

The manometer is one of the simplest spray booth components, and one of the most often overlooked. Trey Peavy, General Manager of RTT Finishing Solutions, and Engineering Manager Cayce Carr walk through installing the standard Dwyer Mark II manometer on an exhaust chamber, from mounting and leveling to filling, zeroing and connecting the pressure ports, so you can monitor filter loading and stay compliant.

Video Chapters

Introduction

Hello everyone. I’m Trey Peavy, General Manager of RTT Finishing Solutions. Today we’re going to talk about the Dwyer Mark II manometer.

The manometer comes standard on every RTT spray booth, from industrial exhaust chambers up to large equipment booths with air handling equipment. It’s a simple, basic component, but it often gets forgotten. It’s also required by authorities such as OSHA and NFPA.

What’s in the box

The RTT part number is ACC5075. When you unbox it, you’ll find:

  • Tubing
  • The Dwyer Mark II manometer
  • A bag of hardware with everything you need to install it
  • The manual

How the manometer works

The gauge reads in inches of water column. In a spray booth, it measures the pressure drop across the filter face. It reads the combined resistance of every filter between its two pressure ports, so depending on how it’s installed, it can read one, two or three filter stages at once.

The installation later in this video will make this clearer.

Setting the zero knob

This is the fill opening, and this is the zero knob. Before you fill the gauge:

  1. Turn the zero knob all the way out.
  2. Turn it three full turns back in.

This centers the knob in its adjustment range, so you have room to move it either way when zeroing.

Leveling and mounting holes

The gauge has a small built-in level. Because it’s liquid-filled, it must be level when mounted. There are two mounting holes. The bottom one is slightly slotted, so you can adjust the gauge until it’s level.

Tools you’ll need

  • 1/8" drill bit: for the mounting screws. They’re self-tapping, not self-drilling, so you need to drill a pilot hole.
  • 13/32" drill bit: for the pressure port. A 3/8" bit is easier to find, but you may need to enlarge the hole slightly to fit the pipe fitting.
  • Plastic hose barb fittings: included, with a backer nut and washers.
  • Tape measure: to measure the spacing between mounting holes.
  • Torpedo level: to level the gauge.
  • Drill
  • Flathead screwdriver: for the mounting hardware.
  • Crescent wrench: to snug the fittings.

Now I’ll hand it over to Cayce Carr for the installation.

Installation tips

Hi everyone. I’m Cayce Carr, Engineering Manager at RTT Finishing Solutions. Let’s keep it rolling with the installation.

There are two main things to consider:

  1. Keep the tubing run short. Per Dwyer’s instructions, keep the tubing within 3 ft.
  2. Mount it on the exhaust chamber if you can. The mounting screws then end up inside the chamber, so they don’t stick out on the booth’s interior cleaning surfaces.

Mount the gauge where the operator can easily see and adjust it.

Marking and leveling

  1. Mark where you want to install the gauge.
  2. Place your level on that first mark and draw a plumb vertical line about 4" long.
  3. Go over the line with a marker so it’s easier to see.
  4. Measure 3-15/16" along the line and mark the second hole.

The slotted bottom hole gives you some room to level the gauge.

Drilling and mounting

  1. Drill both holes with the 1/8" bit.
  2. Start the top screw, but leave it slightly loose so you can still see the bottom hole.
  3. Install the bottom screw. The screws are firm at first, then turn easily once they bite.
  4. Snug both screws.
  5. Check with the level and adjust the gauge until it’s level. Keep a hand on it while tightening, because it can shift.

The manometer is now mounted on the exhaust chamber, with the screws hidden inside.

Filling with gauge fluid

Trey already set the zero knob, so the next step is filling.

  1. Make sure both pressure tubes are disconnected from the manometer.
  2. Remove the fill cap.
  3. Add fluid slowly. Once the fluid starts to register, it rises very quickly.
  4. Stop when it reaches zero. It’s easy to overfill. If you do, you may need a pipe cleaner to remove the excess.
  5. Pause and let the level settle, then add a touch more if needed. Once you’re close, you can fine-tune with the zero knob.
  6. Replace the fill cap.

Zero the gauge with the fill cap off and the pressure tubes disconnected.

High and low pressure ports

The manometer has two ports:

  • Low-pressure side: connects behind the filters, inside the exhaust chamber.
  • High-pressure side: connects in front of the filters, inside the booth.

Installing the low-pressure side

  1. Cover the manometer’s ports, for example with the instruction manual, so no metal shavings get inside and ruin the gauge.
  2. Choose a spot for the port fitting directly above the manometer’s low-pressure fitting, for a short tubing run.
  3. Drill a pilot hole with the 1/8" bit.
  4. Drill the port hole with the larger bit. If you used a 3/8" bit, enlarge the hole slightly until the fitting passes through.
  5. Slide the hose barb fitting, with a washer, through the hole.
  6. On the back side, add the washer and nut, and tighten. Snug it with a crescent wrench.
  7. Measure and cut the tubing for the low-pressure side. Leave a little extra length so you don’t cut it short.
  8. Connect the tubing to the port fitting and to the manometer’s low-pressure port.

It doesn’t matter which tube you use, as long as low goes to the rear and high goes to the front. Here, we’re using the tubing without the red line for the low-pressure side.

The high-pressure side isn’t shown in this example. Its port goes inside the booth. Keep it as close to the manometer as possible.

That’s it for manometer installation.


Additional Resources

Not Sure Which System You Need?

Get a system built around your application, with the right airflow, filtration, and fit for your facility.

Request A Quote

With over 75 years of combined experience engineering complex, multi-component finishing solutions, our team has the expertise to design and build equipment for projects of any scale — tailored precisely to your specifications.

 

Share a few details below and we’ll have a proposal back to you within 24 hours.